Positioning of new bridge of 2700 tonnes ( Beringen, Belgium)

Positioning of new bridge of 2700 tonnes ( Beringen, Belgium)

Positioning of new bridge of 2700 tonnes ( Beringen, Belgium)

07 March 2021, 11:29

Victrol has performed the transportation and positioning of the new bridge in Beringen.

The new bowbridge weights about 2700 tonnes and measuring 175 m it is the longest bridge over the Albert Canal.

Great engineering and performance by RoRo Pontoon 4.