Positioning of new bridge of 2700 tonnes ( Beringen, Belgium)
07 March 2021, 11:29
Victrol has performed the transportation and positioning of the new bridge in Beringen.
The new bowbridge weights about 2700 tonnes and measuring 175 m it is the longest bridge over the Albert Canal.
Great engineering and performance by RoRo Pontoon 4.